System
- How To: Configure Token Selection with Attribute Filters in Data Acquisition
- How long it takes to reprocess a shift
- How To: Contact the Australian Micromine Pitram Support Team
- How To: Modify Pitram Control Room Filter/Search Functionality
- How to: Set User Alert Login Messages.
- How To: Manage user roles in Pitram Portal.
Reporting
- How To: Create and Setup a Scheduled Report
- How to: Reassign a scheduled report to another user
- How to Solve: The maximum report processing jobs limit configured by your system administrator has been reached
- How to log a Micromine Pitram support request within our Customer Support Portal
- Extracting a MineMarket report CSV file after reprocessing a shift.
- Enabling macros for Materials Management Reports
Targets
Reference Data
- How To: Make sure Meters Drilled calculates for New Drill Measures using Generated Rule Set
- How to: Set Up Operator Qualifications
- How to Import Locations as a .csv or .xlsx in Dome
- How To: Delete / Restore Tokens
- How to Deploy Reference Data
- Automated Status Change – Entry of Measure Against Equipment